High Power Operations at the Low Energy Demonstration Accelerator (LEDA)

Authors

M. A. Duran, V. R. Harris

Abstract

Recently, the Low-Energy Demonstration Accelerator (LEDA) portion of the Accelerator Production of Tritium (APT) project reached its 100-mA, 8-hr continuous wave (CW) beam operation milestone. The LEDA accelerator is a prototype of the low-energy front-end of the linear accelerator (linac) that would have been used in an APT plant. LEDA consists of a 75-keV proton injector, 6.7-MeV, 350-MHz CW radio-frequency quadrupole (RFQ) with associated high-power and low-level RF systems, a short high-energy beam transport (HEBT) and high-power (670-kW CW) beam dump. Details of the LEDA design features will be discussed along with the operational health physics experiences that occurred during the LEDA commissioning phase.

Meeting

This abstract was presented at the 34th Annual Midyear Meeting, "Radiation Safety and ALARA Considerations for the 21st Century", ALARA Session, 2/4/2001 - 2/7/2001, held in Anaheim, CA.

 
Index of Midyear Meeting Abstracts